Throughout the project, we’ll post questions and comments that have been submitted on comment cards collected at community meetings, sent via email or submitted via the website.

39 results found
Comments per page 10 | 25 | 50 | 100 View All Export to CSV
← Previous 6 Next 6 →

Showing 7-12 comments of 39

Request For Postponement Of Agenda Item 5, 11-a-8-oa

It has come to our attention that the Community Forum has requested Agenda Item 5, 11-A-18-OA, Consideration of the Comprehensive Update of the City of Knoxville Zoning Ordinance, be postponed from the January 10, 2019, meeting of the Planning Commission to the February 14, 2019, meeting. The Knox County Democratic Party Progressive Action Committee fully supports such a postponement for reasons similar to those outlined in the Community Forum letter. We urge you to make such a postponement.
Staff Reply:

Recode, Zone Map

I attended the last work shop on 1/3/19 for the recode, I do have some issues with the latest draft. My area has been rezoned back to RN2, but the lot size for a duplex has been lowered from 10,000 sqft of lot space to 7,500 which is the standard size lot in most historic neighborhoods. I do not have an issue with someone wanting to build a NEW duplex that would fit into the character of the neighborhood. But my fear is that we will go back decades inwhich every foot of building space will be converted into "living" area, porches and balconies, will be converted into bedrooms and bathrooms as in the past. We here in Parkridge have spent years trying to over come this exact same type of over crowding and destruction of the historic fabric of our neighborhood. With only small portion of Parkridge protected by a historic overlay and no in fill housing guidelines, we would be damned to repeat our very bad past history. Parkridge would is better suited for RN3 like other historic neighborhoods like 4th and Gill.Also on a technical note, I noticed that under the minimum interior side setback has been changed to a minimum of 20', on a 50' wide lot, as in most cases in historic neighborhoods that would limit the buildable area of 30' wide. I think as it stands now, the minimum is 5', and minimum of 12' combined.
Staff Reply:

Recode Timing Is Way To Fast

Why is the comment period so short and over the Holidays? Is Donald Trump now our Mayor and we'll just push this through lickety-split while no one is watching? I've read a few comments on draft #4 with its over 700 changes and one theme appears over and over and over again: there hasn't been enough time to read it! This isn't Congress, this isn't the Trump Administration--this is LOCAL. We need more time to discuss such huge changes. An H1 effort in Parkridge spanned FIVE YEARS of continual meetings, planning, debates, door-to-door knocking, mailers, flyers, everything short of writing it in the sky with an airplane (which Councilman Brown insisted would still result in someone saying they never heard about it) and yet it was smacked down by Mayor Rogero for needing "more discussion time". If FIVE YEARS isn't long enough for a neighborhood of a few hundred acres, how is the measly 7 months this has been public (since the June 2018 release of the maps--everything before that wasn't very useful for the public) long enough for a city encompassing 104.2 square miles? The obvious answer is that either the public doesn't know what it wants and the City needs to tell us what we want or the public wants something contrary to what the Mayor, Mr. Lyons, and the political/developer machine want.What's the rush? Parkridge was told that we have plenty of time to go block-by-block over many years to protect affordable housing; Knoxville already has a zoning code that's worked well enough for 50 years so there's no desperate need to install a zoning code. City Council didn't have a problem pushing the Parkridge H1 off onto a new Council but now the excuse for the rush is so that the next council won't have to deal with it. A project this monumental should take place over several sitting City Councils. I am saddened that is has become just a political plum for an outgoing administration.
Staff Reply:

Recode Text Changes

Attached are the comments from the City.

Staff Reply:

Recode Knoxville

Over the past days I was reviewing the 4th version on Recode and would like to ask why Materials are excluding from being used in zones?  I strongly disagree with any exclusion of materials.  Having just worked on a project in Muscle Shoals, AL recently there was a material exclusion and it was going to cost the owner 40% more for his typical building by changing material.  We went in front of City Council and they understood our issue and allowed the material. 

How do you think Sequatchie Concrete Services on Sutherland Avenue in Knoxville would feel if CMU is exclude as a material in the city they do business in? Or what about other companies located in Knoxville that makes a forbidden material are you wanting them to leave the area? That doesn’t make planning since.  If you want better design this isn’t the way to go about it. 

I ask that you exclude any building material references in the new zoning ordinance.

Staff Reply:
The restriction on materials was proposed by the consultants assisting with the zoning code update based on their experience in other cities and research done by them. We are still revising the materials restrictions to further reduce and clarify the restricted materials, with input from AIA-ETN. Please note that the restrictions are only for the facade that faces a public right-of-way and only in certain zoning districts. In the downtown district, the Downtown Design Review Board can waive the restriction on materials. In the other districts in which materials are restricted, they can still be used for up to 25% of the facade. Our goal is to ensure the ability to use a variety of materials in all structures.--Response from original poster:I appreciate your response and I have spoken with John Sanders the AIA representative and he was the one who told me to reach out to you. Limiting materials is not what a zoning ordinance should encompass. The Ordinance does not get updated very often as you can see with our current one. For example, you want to exclude plastics from commercial zones. I am the chair for the School of Architecture Dean’s Board, did you know we printed a House out of plastic? It won several awards nationally see the link https://web.ornl.gov/sci/eere/amie/. This technology will only grow. My point is materials constantly update and change, just look at the plastic house. Let architects decide the proper materials not planners.

Recode Effect On East Knoxville

I hope that MPC and the City really think hard about how this recoding of Knoxville will ultimately effect the people that live on the east side(Park City).Just to create density for the sake of more housing may do more harm than good. East of downtown has at this time very little to offer anyone that is low income.There are few jobs and the ones that are available are minimum wage, which at the rate of cost of living two people making minimum wage can not afford housing. There are no grocery stores, its a food desert, unless you have your own transportation. And now that St Mary's has closed there is no medical provider on the east side of town. And none of this is going to change because for any business to locate in any area they are going to look at the median income, so if the city keeps concentrating low income in the 6th district we are not going to attract any future businesses. The city and county need to spread out the low income density across the area so these people will have the availability to be able to help themselves out of their current situations. there was a study done to test the effect of the zip code inwhich you were born, born in a poor zip code you are pretty much doomed.MPC and City, think long and hard about what your are about to do, the effects will last for decades!
Staff Reply:

39 results found
Comments per page 10 | 25 | 50 | 100 View All Export to CSV