Draft 6

Numerous changes have been made to Draft 5. With so many changes why is it not titled Draft 6 since that is what it is? Changing the format on how you report the last minute changes is too difficult to understand. Stay with the previous style of changes so citizens can review only the changes as they apply to the specific Article.

Staff Reply:

Landscape Bond

The following should be added to Article 12. LANDSCAPE

12.11 LANDSCAPE BOND
In order to ensure correct installation and maintenance of landscaping, a landscape bond will be required.

No certificate of occupancy will be approved before the developer or owner has posted a landscape maintenance bond guaranteeing all landscaping materials and work for a period of two years after approval or acceptance thereof by the City in a sum established by the Knoxville-Knox County Planning Commission. The bond will be in the amount of 110% of the estimated cost of replacing and maintaining the landscaping required by these specifications, unless otherwise specified by the Knoxville-Knox County Planning Commission. 

A. Inspections

1. Installation
The developer or owner will be allowed six (6) months after a certificate of occupancy has been issued to install landscaping material according to the approved plan. This will enable planting to occur during optimal weather conditions and to ensure the availability of the approved materials. At the end of six months, the Zoning Administrator will inspect all required landscaping and certify that it has been properly installed and is in good health. If corrections are to be made the Zoning Administrator will notify the owner or developer. All unhealthy, defective or dead plant material will be replaced within three (3) months, at the end of which the Zoning Administrator will again inspect the landscaping. The bond shall be called if the required landscaping has not been installed or corrected by the end of this period, and the funds shall be applied to complete the landscaping work.

2. Maintenance 
Two years after a certificate of occupancy has been issued the Zoning Administrator will inspect all required landscaping and certify that it has been properly maintained. If no maintenance is required, the City will release the landscape bond. If corrections are to be made, the Zoning Administrator will notify the owner or developer and the bond company of any corrections. All unhealthy, defective or dead plant material shall be replaced within three (3) months. The Zoning Administrator will conduct a final inspection and if no further maintenance is required, the City will release the landscape bond. If deficiencies in the landscaping still exist, the bond shall be called and the funds shall be applied to complete the landscaping work.